Pad drilling

From Wikimarcellus

(Difference between revisions)
Jump to: navigation, search
Revision as of 17:42, 25 July 2010
Tcopley (Talk | contribs)
(The intent is to drill as many wells)
← Previous diff
Revision as of 20:02, 25 July 2010
Tcopley (Talk | contribs)

Next diff →
Line 3: Line 3:
Typically the land required for a well pad is rectangular--usually about one half mile wide by two miles long with the pad itself positioned in the center of the rectangle. Typically the land required for a well pad is rectangular--usually about one half mile wide by two miles long with the pad itself positioned in the center of the rectangle.
-Pad drilling is often accomplished through the use of a movable [[flex rig]].+Pad drilling is often accomplished through the use of a movable [[flex rig|flex]] of [[fit-for-purpose rig]]s.
-The intent is to drill as many wells on a pad as are economically feasible.+The intent is to drill as many wells on a pad as are economically feasible. Drilling more wells on a pad helps to minimize the environmental footprint of drilling.

Revision as of 20:02, 25 July 2010

When multiple wells are drilled from the same pad, it is often referred to as pad drilling. Typically 6 or 8 horizontal wells may stem from the same pad.

Typically the land required for a well pad is rectangular--usually about one half mile wide by two miles long with the pad itself positioned in the center of the rectangle.

Pad drilling is often accomplished through the use of a movable flex of fit-for-purpose rigs.

The intent is to drill as many wells on a pad as are economically feasible. Drilling more wells on a pad helps to minimize the environmental footprint of drilling.

Personal tools