Drilling safely issues

From Wikimarcellus

Jump to: navigation, search

Drilling safety issues can be mitigated through greater automation. Risks can be managed, but the more drilling hands come in contact with moving steel on a well site, the higher the risk of accident. Incidents can be minimized through the use of automation and hydraulics.

Hydraulic equipment leads to a risk of leaking fluid--even if only on a maintenance schedule.

A 40-mil plastic is placed like an apron around the base of the rig to protect the ground. This contains any fluid from leaking hydraulics. Such a leak could be under pressure and thus shoot a considerable distance from its source. Hence, the plastic and berm are extended to a point where there is virtually no possibility of a spill reaching.

A containment pit sits behind the rig to catch the drill filings and crushed rock that comes back up the well bore in water-based drilling fluid.

Other safety measures include using an automated pipe handling system that eliminates the need for workers to screw together 30 foot sections of steel pipe. Also, a blowout protector shuts down the well when an unexpected flow of pressure occurs. Redundant systems are used as back-up.

In the driller shack on the upper level of the rig, an operator monitors the depth of drilling, hydraulic pressure measures, and temperature. This operator maintains control of the blowout protector.

Personal tools