Marc I Hub Line

From Wikimarcellus

Revision as of 18:14, 29 August 2009; view current revision
←Older revision | Newer revision→
Jump to: navigation, search

In August, 2008 Inergy Midstream, LLC, a wholly-owned subsidiary of Inergy LP, was in the process of developing the 43-mile-long Marc I Hub Line, a 24 inch pipeline connecting an Inergy lateral pipeline off The Tennessee Gas Pipeline's 300 Line and Transco's Leidy Line. Both of these two interstate lines cut through Bradford County, PA where this Inergy interconect is located.

The CEO was quoted as saying that Inergy's goal is to:

"...create an integrated Northeast gas infrastructure hub utilizing our existing 40 miles of pipeline and nearly 40 Bcf of gas storage capacity that with the construction of the 43 mile Marc I Hub Line, is strategically connected to Transco, TGP, and the Millennium pipelines."
Personal tools