Search results

From Wikimarcellus

For query "Next"
Jump to: navigation, search

For more information about searching Wikimarcellus, see Searching Wikimarcellus.

Showing below up to 20 results starting with #1.


View (previous 20) (next 20) (20 | 50 | 100 | 250 | 500).

No page title matches

Page text matches

  1. Chesapeake Energy (30682 bytes)
    182: ...ling and completion carry to be paid out over the next three years. Chesapeake was to serve as operator ...
    186: ...llion was to be invested by the partners over the next five years, with ownership divided among the part...
  2. Seneca Energy Production Company (11795 bytes)
    37: ...ate of 10 Mmcf/d and averaged 9.5 Mmcf/d over the next 7 days. The same report noted that the 7-day init...
  3. EQT Corporation (17700 bytes)
    112: ...a large frac evaporation and crystallization pond next to it). Waynesburg, PA in September, 2010.<br>Pho...
  4. Carrizo Oil and Gas (12660 bytes)
    10: ...s development expenses including its own over the next 2 years until the $52 million carry became exhaus...
    38: ... time, well pads were being cleared for Carrizo's next three wells in the area. All three were to spud ...
  5. Epsilon Energy Ltd (9905 bytes)
    48: ... 10 Mmcf/d. This sum exceeded the capacity of the next compressor the company planned to bring online ar...
  6. Rex Energy Corporation (19536 bytes)
    57: ... online from additional horizontal wells over the next two years. Rex continued to lease additional acre...
  7. East Resources (7879 bytes)
    12: ...had leased acreage in [[Tioga|Tioga County]], the next county east of Potter County. '''''Update:''''' A...
  8. Mark West Energy (2792 bytes)
    11: ... of pipeline gathering system. It was to be built next to the refrigeration plant in Chartiers Township....
  9. CONSOL Energy Inc (23934 bytes)
    75: ...ownship near Washington, PA. This area is located next to Cross Creek Park and around 10 miles northwest...
  10. Horizontal drilling (3119 bytes)
    6: ... arrayed like stacked pancakes--one on top of the next. Greater well bore exposure to a formation such a...
  11. Trans Energy Inc (5344 bytes)
    6: ...s sales line. The same report indicated that the next horizontal well the company planed to complete wa...
  12. Citrus Energy (3335 bytes)
    7: ...n of Highland Township along Sarvey Mill Road and next to Farmington and Knox townships. The permit appl...
  13. Talisman Energy Inc (20910 bytes)
    67: ...tly expand its workforce in Tioga County over the next 5 years.
  14. Helicopters (1677 bytes)
    5: ...by the awaiting helicopter and transported to its next location. This same operation is repeated over an...
  15. Heliportable equipment (1725 bytes)
    5: ...by the awaiting helicopter and transported to its next location. This same operation is repeated over an...
  16. Energy Corporation of America (6730 bytes)
    23: ...ntal wells per month up to a total of 75 over the next three years. It also had more than 40 miles of pi...
  17. Drilling practices (3875 bytes)
    5: ...ur shifts for two weeks straight and then get the next two off. Experienced drill hands come in from Tex...
  18. Anschutz Exploration (2206 bytes)
    5: ...mmediate plans to drill this well at least in the next six months.
  19. Endeavour International Corp (1492 bytes)
    5: ...Cohort's drilling and completion expenses for the next few years. The transaction also covered 7,250 net...
  20. Natural gas liquids (1316 bytes)
    3: A type number such as “(C2)” next to each NGL denotes how many carbon atoms a molec...

View (previous 20) (next 20) (20 | 50 | 100 | 250 | 500).



Search in namespaces :

List redirects   Search for
Views
Personal tools